Project Description
ZAGORI WATER
Inox pipe network connections
Installation of the tank and connection with the existing PET – preform network, with the use of 6 existing inox pipes and the construction of 12 stainless steel half-tees.
Construction and installation of water filtersfor the new bottling lines.